Wet acidic exhaust destroys galvanised and coated steel ductwork from the inside. GRP ducting has no coating to fail. We build rectangular and circular ducts, fume extraction runs and stack liners, with nozzles and access openings moulded in.
Ducting is rarely a catalogue item. Cross-section, routing and support points are set by the building, so almost every job is designed and built to the specific installation.
Round and rectangular sections, joined by bolted flange or laminated butt and strap.

Illustrative images, not project photographs.

The usual choice inside buildings, where a rectangular section fits the available ceiling space better than a round one. Flat panels carry less load than a cylinder, so stiffener design does the work.

Structurally the most efficient section, and the preferred choice for longer runs and higher negative pressure. Filament wound in the same way as pipe.

A GRP liner inside an existing steel or concrete stack. The structure stays, the corroding surface is replaced. Often the cheaper answer to a failing stack.
| Item | Detail |
|---|---|
| Section | Rectangular, circular, and transition pieces between the two |
| Size range | Circular DN100 to DN3000. Rectangular sized to the installation, no fixed limit |
| Resin | Vinyl ester for wet acidic exhaust. Isophthalic for general ventilation. Fire-retardant grade to ASTM E84 Class I where required |
| Liner | C-veil for acid service. Synthetic veil for general service |
| Reinforcement | External ribs and stiffeners, spacing set by the negative pressure case |
| Jointing | Bolted flange joint, or laminated butt and strap overlay. Both are standard for round and rectangular sections |
| Integral fittings | Access doors, damper frames, drain points, instrument ports, support lugs |
| Standards | ASTM D2996 (wound sections), ASTM E84 (fire-retardant grade), client specification |
Sizes above are our normal working range. If your scope falls outside it, send the specification and we will confirm whether we can build it.
An exhaust duct spends its life under suction. Internal pressure is easy to design for, because it pushes the wall into tension where the laminate is strongest. Suction does the opposite, and a duct that fails does so by buckling inward, not by bursting.
This is why we ask for flow rate, fan pressure and the routing before quoting. Duct that is priced on area alone is priced without knowing what holds it up.
Select any item to open the project detail page.
Cleanroom exhaust ducting, with stiffener design set by the negative pressure case.
Scrubbers and connecting ductwork supplied together as an array for a new facility.
Acid fume extraction in continuous wet corrosive service, built to Japanese client requirements.
Gas composition, operating temperature, flow rate, fan static pressure and the routing are enough for us to size the section and the stiffeners. A layout sketch is fine, drawings are not required.