Where acid runs,
steel doesn't last

Exhaust scrubbers in semiconductor fabs, hydrochloric acid storage in steel mills, fume ducting in chemical plants. Equipment carrying acid and wet corrosive gas is where we have delivered most of our work.

14 Delivered Projects Korea / Vietnam / Japan Vinyl ester + C-veil Scrubber / Tank / Duct
GRP scrubber towers and exhaust duct at an industrial plant
Delivered Projects

Three industries, fourteen projects

These are delivered projects. Select any item to open the project detail page.

Products

What we mostly supply here

Industrial plants take more vessels and ducting than piping. Most items are non-standard geometry and are designed and built individually.

SCRUBBER CONSTRUCTIONInside a GRP scrubber towerCutaway model. The tower and its internals support are ours. The pump and fan are not.010203040501Shell laminateDual laminate: barrier resin inside, structural outside.02Mist eliminatorCarryover is caught before the gas leaves the tower.03Spray headersGRP headers and nozzle laterals, fed by the recycle line.04Packing and supportRandom or structured packing on a GRP support grid.05Sump and recycleSump, recirculation line and nozzles are all GRP.GRP / FRP supply scopeRotating equipment, not oursThe tower, the internals support, the ducting and the recycle line are GRP.The pump and the fan are not. We supply the parts that see the chemistry.

A scrubber tower in section. The pump and the fan are not in our scope.

Chemical handling area. GRP process tanks and dosing piping.
Chemical handling area. GRP process tanks and dosing piping.
Scrubber manway open, showing packing and the support grid.
Scrubber manway open, showing packing and the support grid.

Illustrative images, not project photographs.

PRODUCT 01

Scrubber

Absorption towers for hydrochloric and sulphuric acid gas. Packing supports, nozzles, manways and demister housings are moulded integrally. Resin and liner are selected for the specific gas composition and temperature.

Tanks and Scrubbers
PRODUCT 02

Storage Tank

Storage for hydrochloric acid, sulphuric acid and caustic soda. Both cylindrical and rectangular, with rib reinforcement designed for the static head and any negative pressure condition.

Tanks and Scrubbers
PRODUCT 03

Duct and Stack

Rectangular and circular exhaust ducting, fume ducts and stack liners. Buckling checks and stiffener spacing govern the design in negative pressure sections.

FRP Solutions
Scope of Experience

Delivered: Exhaust scrubbers, acid storage tanks, exhaust ducting and wastewater vessels for semiconductor, steel and chemical plants. Fourteen projects across Korea, Vietnam and Japan.

Capability: GRP vessels, ducting and piping for acid service and wet corrosive gas generally.

How we supply: We work as a sub-supplier through EPC contractors, plant maintenance companies and equipment vendors. We do not approach end users directly.

Five of the projects above were delivered to Japanese clients, under their inspection and documentation requirements. If your project carries specific inspection requirements, tell us at the specification review stage.

Start with the gas and the temperature

Tell us the gas composition, operating temperature, flow rate and the space available. We will review resin specification and vessel geometry and come back to you. A concept sketch is enough for a first assessment, drawings are not required.

Contact wiget Chat Zalo