FRP for Power Plants
Thermal & Combined-cycle
Power Generation

Leeho Vina is a Vietnam-based, 100% Korean-invested composite manufacturer specializing in mission-critical FRP/GRP equipment for FGD desulfurization, cooling water systems, and chemical storage in power plants across ASEAN.

Specialization
FGD · CW · Tank
Track Record
45+ Years
Diameter Range
Ø 0.015 – 5.0 m
FIG.01 · LEEHO FRP SCOPE IN A COAL-FIRED POWER PLANT
FIG.01 · DWG.PP-001 · Leeho FRP Scope in Coal-fired Power Plant · P&ID
SCOPE MAPWhere GRP goes in a thermal power plantIsometric scope model. Green runs are ours, grey equipment is not.010203040506GRP / FRP supply scopeOutside our scope01Seawater intakeScreened seawater to the CW pump house. Buried largebore.02Circulating water supplyPump house to condenser. DN500 to DN5000.03OutfallWarm water return to sea. No cathodic protectionneeded.04FGD absorber feedAbsorbent reagent and spray header piping.05Slurry recirculationAbrasion-grade laminate. Stack liner in the same scope.06Chemical dosingHCl, NaOH and NaOCl from storage to injection points.Grey items are outside our scope. We do not quote what we should not build.

GRP scope across a thermal power plant. Grey structures sit outside our supply. Illustrative diagram.

Circulating water outfall. Large bore GRP lines on concrete saddles.
Circulating water outfall. Large bore GRP lines on concrete saddles.
FGD absorber. GRP slurry piping and spray header branches.
FGD absorber. GRP slurry piping and spray header branches.
Circulating water pump house. GRP discharge header and elbows.
Circulating water pump house. GRP discharge header and elbows.

Illustrative images, not project photographs.

// Why Power Plants Choose Leeho

Composite expertise
built for 24/7 generation

Power plants run hot, wet, acidic, and salty, a punishing environment for steel. Leeho Vina has spent over four decades engineering filament-wound and hand-laid FRP/GRP equipment that outlasts every conventional alternative. Our composite absorber towers, ducting, slurry tanks, and seawater piping are operating across thermal, gas, and combined-cycle sites in Korea and Vietnam.

Every project is engineered to ASTM D3299, D3982, BS 4994, JIS K7012, and KEPCO ES specifications, with full third-party witnessed QA and traceable raw material certification. Our Phu Tho facility delivers components from 50 mm fittings to 5.0 m diameter absorbers. Leeho's largest filament-wound vessel to date measured DN 2500 × 23 m H, supplied to POSCO POSLX in 2023.

45+ yr
FRP Heritage
200+
Projects Delivered
50+ yr
Design Service Life
// Where FRP Belongs in a Power Plant

End-to-end Composite Supply

From the boiler outlet to the cooling tower return, Leeho FRP equipment touches every wet, corrosive, or chemically aggressive process line in a modern power plant.

DWG.PP-100 · COAL / GAS-FIRED POWER PLANT · LEEHO FRP SCOPE · NTS123456781Boiler / steam generator2Electrostatic precipitator3FGD absorber (FRP)4Slurry tank (FRP)5Stack6Steam surface condenser7Counterflow cooling tower8FRP chemical storageGRP / FRP supply scope, Leeho VinaConventional equipment by others
FRP / GRP: Leeho Scope

Composite ducts, absorber, slurry lines, CW pipes, storage tanks for corrosion-immune wet/acidic service.

Conventional Steel/Alloy

Boiler, turbine, condenser pressure parts at high steam temperature & pressure.

Auxiliary Equipment

ESP, fans, motors and ash handling: typically alloy or coated steel.

Steam / Water Streams

Condensate flow, steam path and high-pressure feedwater in a closed loop.

Filament Winding

CNC-controlled winding for ø 50 mm – 5.0 m vessels & pipes

Hand Lay-up & Pultrusion

Custom flanges, fittings, structural profiles, scrubber internals

QA / QC Witnessed

ASTM D2563, hydro test, Barcol, ultrasonic, with full test reports

Site Service

Field installation, on-site joining, supervisory & repair team

Need a power-plant FRP quote?

Send us your line list, P&ID extract, or tank schedule, and we reply within 24 hours.